|
Left: a
plate about to be lifted manually
Right: a mezzanine section with completely
installed plates
The mezzanine floor must be
completed before machines are installed
underneath, because it holds air conditioning
system, filters, lightings, electricities and
other utitilites. Sandwich panels covering are
to be installed later. |
Kiri:
sebuah plat akan diangkat secara manual
Kanan: bagian mezzanine dengan plat yang telah
terpasang
Lantai
mezzanine harus diselesaikan terlebih dahulu
sebelum mesin-mesin diletakkan di bawahnya,
karena mezzanine akan menampung instalasi ac,
filter, lampu, kelistrikan dan instalasi lain.
Nantinya akan ditutup dengan sandwich panel. |